Welcome! Please use the navigational links to explore our website.
PartsASAP LogoCompany Logo (800) 853-2651

Shop Now

   Allis Chalmers Case Farmall IH Ford 8N,9N,2N Ford
   Ferguson John Deere Massey Ferguson Minn. Moline Oliver
 
Marketplace
Classified Ads
Photo Ads
Tractor Parts
Salvage

Community
Discussion Forums
Project Journals
Your Stories
Events Calendar
Hauling Schedule

Galleries
Tractor Photos
Implement Photos
Vintage Photos
Help Identify
Parts & Pieces
Stuck & Troubled
Vintage Ads
Community Album
Photo Ad Archives

Research & Info
Articles
Tractor Registry
Tip of the Day
Safety Cartoons
Tractor Values
Serial Numbers
Tune-Up Guide
Paint Codes
List Prices
Production Nbrs
Tune-Up Specs
Torque Values
3-Point Specs
Glossary

Miscellaneous
Tractor Games
Just For Kids
Virtual Show
Museum Guide
Memorial Page
Feedback Form

Yesterday's Tractors Facebook Page

  
Tractor Talk Discussion Board

Re: Designing a work shop


[ Expand ] [ View Replies ] [ Add a Reply ] [ Return to Forum ]

Posted by Billy NY on January 04, 2011 at 17:47:04 from (74.67.3.54):

In Reply to: Designing a work shop posted by redFarmallboy on January 04, 2011 at 11:40:04:

Take your time to complete the design, so that the buildings end user,(you) are satisfied with the results, meaning it works as you want it too.

Take into consideration, things that need to coordinate together, plan for future use, ( ie; extra unused conduit in the slab, drain pipe or what have you - once its poured.... too late )


There is already some great information posted, just remember, "inspect your expect" size matters, locations of things matters, what is most important - prioritize etc. Take all things, large and small details into consideration.

Think about fasteners, hardware, and how those things work, say for example you erect a block wall, you want to mount something on that wall using expansion bolts, you will want to locate the fasteners in advance, so the cells of the block are filled, making a good connection, things like this are often over looked. Power is another one for example, locate what you need where you need it in advance, make sure you have a large enough service, receptacles, switches are where needed etc., do all these things systematically for each trade, from the site work to the finishes, checking off each so you know your design is complete, and coordinated. Nothing is perfect, so you do the best you can to eliminate problems up front, it minimizes things to a tolerance you can live with.

Once you have the design, have it drafted to reflect exactly what you want built, stuctural coordinated with architectural and M. E. P. (mechanical, electrical and plumbing items). If necessary, also have CSI specifications included, combine all pertinent information into " contract documents" so that when you ask for bids by your contractors, what you give them is complete and more than sufficiently detailed, so that the price reflects the building you want constructed. The contractors scope of work is defined beyond any doubt, also have a change to contract clause in case you need to change or add/delete something, often times this requires unit prices, alternates etc. contractors make good money on these items, so to be fair, it is important especially if you will be your own GC ( general contractor ) as you mention subcontracting major portions of work, in addition to what you will do in house.

Payments, never pay up front... period, use AIA percentage of completion method and hold 10% retainage on all contracts til the building is complete, and you have accepted the work. This gives you leverage in case something goes wrong or work is unacceptable, basically you pay monthly based on acceptable work in place, til the job is done and punchlist of any defects, incomplete or similar things are resolved.

Always maintain a presence when contractors are on site.


Again, take your time, do your research, make sure your design is complete, contains all information, satisfies your needs for the use of the building, these simple things are important and can help avoid major problems, delays and poorly done work.

Weather is always a factor, start at the onset of good weather, or leave enough time to be closed before winter so you can do the finishes inside, and not fight the elements. Timing and scheduling a building project regardless of size is always contingent on weather, play it smart, also a very good idea to create a construction schedule and include it in your contract documents so contractors realize you are serious about deadlines.

Well this is a bit different from what others posted but it is industry standard for large construction projects, even on the small scale, most if not all applies just the same.


Replies:




Add a Reply

:
:
:

:

:

:

:

:

:

Advanced Posting Options

: If you check this box, email will be sent to you whenever someone replies to this message. Your email address must be entered above to receive notification. This notification will be cancelled automatically after 2 weeks.



 
Advanced Posting Tools
  Upload Photo  Select Gallery Photo  Attach Serial # List 
Return to Post 

TRACTOR PARTS TRACTOR MANUALS
We sell tractor parts!  We have the parts you need to repair your tractor - the right parts. Our low prices and years of research make us your best choice when you need parts. Shop Online Today. [ About Us ]

Home  |  Forums


Today's Featured Article - Talk of the Town: The Saga of Grandpa's Tractor - by The following saga is from the Tractor Talk Discussion Forum. Someone. The saga starts with the following message: Hey guys I have a decision to make. I know what you all will probably suggest and it will probably agree with me way down inside, but here it is. I have a picture blown up and framed in my "tractor room" of a Farmall M. It was my Grandpa's tractor, of which whom I never got to meet. He froze to death getting this tractor out of the barn to pull a truck out of the ditch before I was born. Anyway my dad and aunt had to sell it at the auction, ... [Read Article]

Latest Ad: Sell 1958 Hi-Altitude Massey Fergerson tractor, original condition. three point hitch pto engine, Runs well, photos available upon request [More Ads]

Copyright © 1997-2024 Yesterday's Tractor Co.

All Rights Reserved. Reproduction of any part of this website, including design and content, without written permission is strictly prohibited. Trade Marks and Trade Names contained and used in this Website are those of others, and are used in this Website in a descriptive sense to refer to the products of others. Use of this Web site constitutes acceptance of our User Agreement and Privacy Policy

TRADEMARK DISCLAIMER: Tradenames and Trademarks referred to within Yesterday's Tractor Co. products and within the Yesterday's Tractor Co. websites are the property of their respective trademark holders. None of these trademark holders are affiliated with Yesterday's Tractor Co., our products, or our website nor are we sponsored by them. John Deere and its logos are the registered trademarks of the John Deere Corporation. Agco, Agco Allis, White, Massey Ferguson and their logos are the registered trademarks of AGCO Corporation. Case, Case-IH, Farmall, International Harvester, New Holland and their logos are registered trademarks of CNH Global N.V.

Yesterday's Tractors - Antique Tractor Headquarters

Website Accessibility Policy