I called my contractor to have him build me a new garage. He convinced me to do the excavation myself including the footer. "How hard can it be, it's just a hole" he said.
So I bought a 24" bucket to replace the 8" bucket and got to work. The machine held up very well and about 3 hours I had the first leg 44' long. Mostly clay and large rocks. But it powered through.
So I bought a 24" bucket to replace the 8" bucket and got to work. The machine held up very well and about 3 hours I had the first leg 44' long. Mostly clay and large rocks. But it powered through.