fixerupper
Well-known Member
The center tubes are laid and bermed up with sand to hold them in place. The tapered ends are installed on the downstream end but not the upstream end. The crew probably won't be back till Monday. They live a ways away and need to see their families.
Old bridge
The floor is laid and leveled and ready for the tubes
The tubes were laid today. Took them awhile to get the tubes in position and held in place so they won't move while the fill sand is put around them.
Inspector K9
Old bridge
The floor is laid and leveled and ready for the tubes
The tubes were laid today. Took them awhile to get the tubes in position and held in place so they won't move while the fill sand is put around them.
Inspector K9