I want to rebuild a lean-to on the side of a gambrel roof barn so the roof has some pitch to it. Right now it's almost flat and leaks.
Right now the lean-to roof starts at the eave of the gambrel roof and runs at about a 1/12 pitch.
When I rebuild it, I want to start at the hip of the gambrel roof and come out at about a 4/12 pitch, and cover it with steel.
How would I seal the transition from the shingle roof to the steel? The shingle roof on the high barn is still in good shape.
Right now the lean-to roof starts at the eave of the gambrel roof and runs at about a 1/12 pitch.
When I rebuild it, I want to start at the hip of the gambrel roof and come out at about a 4/12 pitch, and cover it with steel.
How would I seal the transition from the shingle roof to the steel? The shingle roof on the high barn is still in good shape.